2 new lane closures reported for Paseo/I-25 project

Posted at: 10/28/2013 8:34 AM
By: Elizabeth Reed, KOB.com



There are two new lane closures for drivers to watch out for during the Paseo/I-25 Interchange construction project.

On Monday, the left lane of the I-25 southbound off ramp will be closed.

From 7 p.m. to 5 a.m., the I-25 southbound right lane will be closed as crews install a barrier wall.

For updates and traffic conditions, visit www.paseoi25.com.